Next Article in Journal
Analysis of Flow Characteristics around a Square Cylinder with Boundary Constraint
Next Article in Special Issue
EPANET INP Code for Incomplete Mixing Model in Cross Junctions for Water Distribution Networks
Previous Article in Journal
Uncovering the Depletion Patterns of Inland Water Bodies via Remote Sensing, Data Mining, and Statistical Analysis
Previous Article in Special Issue
Comparative Analysis on the DMA Partitioning Methods Whether Trunk Mains Participated
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Risk Assessment Model for the Renewal of Water Distribution Networks: A Practical Approach

Civil Engineering Division, Instituto Tecnológico de Aeronáutica, São José dos Campos 12228-900, Brazil
*
Author to whom correspondence should be addressed.
Water 2023, 15(8), 1509; https://doi.org/10.3390/w15081509
Submission received: 9 March 2023 / Revised: 24 March 2023 / Accepted: 27 March 2023 / Published: 12 April 2023
(This article belongs to the Special Issue Drinking Water Distribution Systems: Hydraulics and Water Quality)

Abstract

:
Water distribution networks are the most important and costly infrastructure assets of the water supply system, responsible for ensuring a steady and reliable water supply to the end user. Consequently, they are fundamental to the socioeconomic prosperity and health of the population. Therefore, determining pipeline renewal strategies is essential in system management. In this article, the development and application of a simplified risk assessment model allowed to highlight the pipes most susceptible to failures and their respective qualitative (water quality index) and financial consequences in a real case study. The results classified approximately 30 km of the distribution network, highlighting 11 pipes with a high risk of failure (≈3.7 km) and an estimated replacement value of BRL 3.2 million, as a priority for renewal in the next 2 years. In small- and medium-sized water distribution systems with limited technical and financial resources, this model can prove highly useful, as it uses free computer tools and a simple methodology that does not depend on statistical models, mathematical estimates, complex regressions, and intensive computational resources.

1. Introduction

Water distribution networks are the most important and costly infrastructure assets of the water supply system, responsible for ensuring that water reaches the end user in adequate quantity and quality. Consequently, these networks are fundamental to the socioeconomic prosperity and health of the population [1,2,3]. So, the deterioration of this infrastructure presents a great challenge for water utilities around the world. As pipes deteriorate, failures may reduce the hydraulic performance and lead to substantial repair costs, as well as potential dangers of water contamination in the distribution network [4,5]. Therefore, determining pipeline renewal strategies is essential to manage the system [6,7].
A proper distribution network renovation plan should lead to a periodic investigation of the pipelines to determine which ones need to be repaired, renovated, or replaced. Several studies have been carried out so far to determine the most appropriate renewal plans, which classify the rehabilitation activities of the network using deterministic, physical, statistical, and lately, decision-making and risk-based models [8,9,10]. The deterministic models predict the number of pipe failures or the expected time of the next failure based on the different pipe characteristics and local conditions, and can vary in complexity and form, typically ranging from simple linear regression equations to complex multiple regression equations [11,12,13,14,15,16]. Ostfeld [17] provided a comprehensive overview of traditional and recent models, including genetic algorithms and ant-colony optimization, as stand-alone or hybrid data driven heuristic or linear/nonlinear optimization schemes. However, many types of data are required for implementation.
Traditional physical models attempt to represent structural processes leading to pipe failure often providing simplified descriptions of physical degradation processes as water leaks [18,19]. Recently, advanced diagnostic methods have emerged to address these challenges more effectively. One such method, the transient features-based approach [20], leverages hydraulic transient characteristics to detect and predict multi-incipient crack locations, substantially reducing maintenance costs. Another study [21] investigated the impact of gas bubbles on leakage acoustic wave propagation in gas-liquid two-phase flows, highlighting the greater influence of elastic resistance compared to drag resistance. Furthermore, a study on the transient simulation and diagnosis of partial blockages in long-distance water supply systems [22] introduced a diagnostic model based on extreme pressure distribution, demonstrating its effectiveness and suitability for identifying partial blockage zones and intensities in extensive conduits.
Statistical models were developed to address the difficulties of applying physical models and are employed to quantify the structural deterioration of water distribution pipelines based on historical data analyses. However, as with any statistical modeling process, issues related to the “quality and quantity” of this information are crucial for obtaining accurate results [23,24]. Some authors [25,26] compared the strengths, weaknesses, and limitations of these models, as well as problems related to historical data, with general recommendations for overcoming or at least minimizing their occurrence [27].
More recently, studies for the prioritization of pipe renewal have evolved into decision-making models [28,29,30,31,32] and risk assessment models [33,34,35,36,37]. Table 1 shows some of these studies, categorized by type of failure and respective number of risk criteria considered by the authors. Usually, risk is defined as the joint probability of an event occurrence and an estimate of the frequency and physical consequences of undesirable events [38]. This concept applied in water distribution networks refers to the multiplication of the probability of pipe failure and the associated failure consequence, but it is important that these measures are also represented individually as a risk metric in a pipe renewal plan [37,39].
Artificial intelligence techniques have also been used in some models for water distribution network renewal, for example: (a) neuro-fuzzy systems for performance evaluation [41] and life cycle cost analysis [43]; (b) artificial neural networks for predicting the time to failure in years [40] and forecasting the failure rate by pipe type [42]; (c) decision tree learning methods to model pipe deterioration [44]. These are purely data-based approaches that allow for the resolution of complex problems without the need for assumptions of explicitly known and detailed models. However, a large amount of data, programming skills, and computational resources are required, while the internal functioning of the model is not accessible or is only partially known [23].
Given the difficulties of artificial intelligence-based models and considering the type of data typically available, risk assessment models that relate this data to pipe deterioration and associated failure impacts have been considered as an option. For example, Devera [34] developed a simple model that uses the pipe’s age and material to calculate the failure probability (P) and the consequences (C) are determined by the proximity of the pipe to heavily traveled roads, critical services, pipe replacement costs, and the pipe flow capacity. The product of these scores, P and C, was represented in a risk matrix that allowed pipes to receive a linguistic classification represented in a geographic information system (GIS) and, consequently, prioritized actions in the system. In addition, D’Ercole et al. [36] used a computer tool that integrates hydraulic simulation with a topological analysis to deal with complex analysis problems. In this approach, the risk assessment is performed by combining the probability of each pipe breaking with the induced consequence in terms of required water demand and pressure deficit. Despite being an alternative to more complex models, these two models depend on historical records of the network, e. g., age/material and break rate.
Salehi et al. [37] presented a hybrid decision-making model based on risk, quantitative, and qualitative analyses, which is independent of operational failure data (often uncertain and/or absent). The method uses design parameters (generally obtained from hydraulic modeling of the system) to evaluate the hydraulic and mechanical conditions of pipes in order to prioritize the rehabilitation actions in water distribution systems. However, it is essential to update these parameters regularly using field data measured. In comparison, Phan et al. [45] developed another hybrid risk-based model to prioritize pipe renewal, in which they proposed a fuzzy inference system to aggregate different topological consequences, using algebraic connectivity (AC) to evaluate the effect of pipe breakage on system performance, considering hydraulic importance, repair cost, and local effects as decision criteria. Although it has been reported that AC has correlations with the hydraulic condition of the distribution system, it was suggested to incorporate the effects of pipe breakages on the hydraulic condition of the network in future studies that develop improvement parameters for economic consequences and effects on public health.
Salehi et al. [8] developed a risk-based component model to determine appropriate pipe renewal strategies in water distribution systems. The developed model is based on a multicriteria decision-making method based on fuzzy logic, where the probability of pipe failure (P) and its respective consequences (C) are analyzed independently. Although the developed model can simultaneously evaluate up to 48 criteria to analyze the risk components of each pipe (P and C), difficulties in implementation have been reported in artificial intelligence-based models. Furthermore, in the model validation, two case studies (Anytown and Two-loop) were considered, where the availability of information limited the number of applied criteria to 19 (categories: hydraulic, mechanical, physical, environmental, social, and safety) and six (categories: hydraulic, mechanical, and safety), respectively.
Boryczko et al. [46] and Raspati et al. [47] focused on risk management in water supply systems. The former emphasizes the importance of preventive strategies and presents a methodology for creating water supply risk maps, using simulations with the EPANET 2.0 software. In contrast, the latter proposes a method that employs the random forest (a machine learning algorithm) and the asset vulnerability analysis toolkit (a set of techniques to assess asset vulnerabilities) to rank pipes according to risk magnitude and facilitating decisions about rehabilitation. Both studies aimed to improve the management of water supply systems, as well as minimizing failures and crises. It is important to note that both models depend on historical records of the network, such as failure rate and pipe age.
Finally, considering several studies related to the planning of pipe renewal in water distribution systems over a period of 10 years (2013/2022) and presented in Table 1, it was possible to find 50 criteria distributed in nine categories partially used in the presented models. Most of these studies associated hydraulic and mechanical criteria to pipe failures, but, they also presented a negligible representation to the water safety category. Many authors [3,45,48,49,50,51,52] highlight that pipe failures (breaks/leaks) may provoke water contamination, harming the health of the population. In addition, some limitations and difficulties for model implementation were identified, especially in small-scale distribution systems, such as: the use of statistical samples, mathematical estimates, complex regressions, historical data, programming techniques, and intensive computational resources. Therefore, it is essential to develop a simplified model that provides comprehensive criteria, including water quality, to guide the renewal of water distribution networks.
In this research, a risk assessment model of operational failures was designed in order to be applied in potable water distribution systems with restricted conditions (with imprecise data about the age of the infrastructure, and limited technical and financial resources). The model highlighted the pipes with the greatest risks within the system using as input hydraulic parameters and mechanical characteristics. These data allowed for the estimation of the probabilities of failures, and for the return of associated consequences, i.e., qualitative impact criteria reflected by the water quality index (WQI) and financial costs (associated to the replacement of the piping) as intermediate outputs. The risk of failure was consequently estimated using the probability of failure and the degree of the impact. Finally, the proposed model was applied to a real water distribution system located in the southeast part of the municipality of São José dos Campos, state of São Paulo, Brazil.

2. Materials and Methods

The methodology of this risk assessment model was structured for each pipe section in three main phases: (1) Determine the probability of failure in the pipe; (2) Evaluate the degree of impact due to the failure; and (3) Determine the risk of the failure.

2.1. Phase 1—Probability of Failure in the Pipe

In this stage, the goal was to determine the probability of failure of the pipelines in the water distribution network. To do this, we considered the hydraulic and mechanical properties of the pipes, such as pressure, velocity, flow rate, length, and diameter. These properties are essential for evaluating the risk of pipe failure and were referred to as pipe design parameters (PDPs).
For example, pressure is a crucial PDP in risk assessment, as the design of the water distribution network establishes the maximum and minimum pressure limits. The minimum limit aims to ensure adequate service to the points of consumption, while the maximum limit is related to the increase in the useful life of the tubes and especially, to the reduction of real losses in the pipelines. If the pressure exceeds the maximum limit, this can lead to the failure of the pipe. Similarly, excessive water velocity might corrode the inner walls of the pipes [53], while an inadequate flow rate can affect the service to the points of consumption [54]. Furthermore, longer pipes are more prone to failure due to pressure and mechanical stress, while pipes with smaller diameters are more prone to blockages and clogs.
To analyze the hydraulic and mechanical properties of the pipes, the QGIS software with the QGISRed v.015 [55] plugin and the Epanet [56] software were used. The plugin QGISRed allowed for the integration of the hydraulic modeling data from the Epanet with QGIS, simulating the behavior of water in the distribution system directly in the GIS. To determine these properties individually for each pipe, seven steps were followed: data acquisition (using six flow meters ultrasonic bulk water meter—Octave: 2 Ø150 M1/M3 and 4 Ø50 M2/M4–M6 integrated to Data-Logger’s VT-490–Vectora: flow rate and pressure), network modeling, parameter definition, calibration, integration, results analysis, and documentation, described in detail in File S1.
For the calculation of the pipe pressure (PPipe), the average of the two corresponding nodes, the upstream (Pi) and downstream (Pj) node pressure, was considered, according to Equation (1)
P P i p e = ( P i + P j ) 2
Once the hydraulic and mechanical parameters of the pipe have been determined, it receives an individual failure probability score (FPSi) by associating its value to the respective range in Table 2, which illustrates the relationship between the PDPs and the pipe failure, which can occur in the form of quantitative events (e.g., pipe bursts) or quality failures (e.g., contamination of the pressurized flow) [37].
The minimum (min) and maximum (max) values of the PDPs are determined according to the valid references for the design and operation of urban water distribution networks [30,57,58]. However, to improve the classification of these parameters, adjustments are necessary depending on the characteristics of the study area [37]. In addition, the average values of these parameters were determined by taking five equal distances between the min-max values, resulting in seven classification categories (very low, low, relatively low, medium, relatively high, high, and very high) for each PDP.
The information obtained in this stage was essential to determine the failure probability score of the pipes and provided a solid foundation for the subsequent phases of this risk assessment model, as the FPS is a crucial factor to obtain the risk of failure.

2.2. Phase 2—Assessment of the Degree of Impact

In this stage, the objective was to determine the consequences related to potential failures in the water distribution network pipes, and evaluate the negative impacts that these failures may cause. The analysis focuses on two fundamental issues: water quality and the cost of pipe replacement.
Both water quality and the cost of pipe replacement are essential in the risk analysis, as a failure in the network can cause leaks and/or bursts, which might affect the quality of the water and/or increase water losses. This has a direct impact on the health of the population and on the budget of the company responsible for the system, factors that directly affect the socioeconomic development of the region.
The methodology used to determine the quality of the water and the cost of pipe replacement for the purpose of classifying the risk associated with these factors is presented in the following subitems.

2.2.1. Potable Water Quality

The water quality index (WQI) was necessary to determine the water quality in the distribution network, but it still required a geographic information system (GIS) to make its spatial representation in each pipe. Therefore, the process of obtaining and analyzing these results involved four consecutive steps: monitoring plan, analysis of potable water, definition and calculation of the WQI, and insertion of the data in the geographic information system (GIS), as detailed in File S2.
Once the WQI was determined individually in the pipe, keeping the same risk levels adopted in Table 2, an impact score was applied according to the values defined in Table 3. This process allowed for a more precise and comprehensive evaluation of the risk of pipe failure and its impacts on water quality.

2.2.2. Pipe Replacement Cost

The water distribution networks are considered to be the most important and costly infrastructure assets in the system and their renewal is crucial to ensure a constant and reliable water supply [1,60,61]. As a result, it is fundamental to consider the financial consequences associated with pipe failure, since these actions involve high costs.
In this context, the estimated cost for pipe replacement was used as the financial criterion for assigning impact points. It is important to note that the costs associated with earth movement, ballast, slab, cradle, scaffolding, and pavement reconstruction were disregarded in the estimate, as it was assumed that the price of the material and the labor for the pipe laying represent all other costs related to the service.
The cost estimate for Brazil was based on the “Bank of Prices for Engineering Works and Services” [56], developed by the Basic Company Sanitation of the State of São Paulo, Brazil (SABESP). This price bank is widely disclosed and used as a reference, not only in the state of São Paulo, but it also has a high national influence in Brazil. Moreover, it is considered quite specific and meticulous for the area of basic sanitation. The values per linear meter for each pipeline in this study are presented in Table 4.
To account for the costs associated with the rehabilitation of each pipe in the water distribution network, the length is multiplied by the associated price from Table 4.
Once the value of the pipe is determined, it receives an impact score (ISCOST), as indicated in Table 5. By incorporating network repair expenses, in this risk assessment model as a final consequence of failure, the result, in addition to being an indicator to prioritize renewal actions, allows managers to estimate the total cost of a pipe replacement project by using pricing strategies that consider the resulting value. In this way, it is possible to price other costs related to the completion of the services.

2.3. Phase 3—Risk of Failure

The final stage of the model is to determine the overall risk of failure for each pipe. The risk of failure combines the cumulative score of the probability of failure (total failure probability score—TFPS) presented in Equation (2) and the qualitative and financial consequences (total impact score—ISTotal) presented in Equation (3). The risk of failure (RFS) is finally defined by Equation (4).
T F P S = F P S P m i n + F P S P m a x + F P S V m i n + F P S V m a x + F P S F R + F P S θ + F P S L
I S T o t a l = I S W Q I + I S C O S T
R F S = T F P S × I S T o t a l
The scores for each probability of failure and the consequences are added for each pipeline segment, the product of these sums results in the value of the risk of failure. The result serves as a comparison mechanism between failures, in this case, a dimensionless number for each pipe that can then be compared to all others, serving as a classification system to highlight the highest risk within a water distribution network. The risks of failure scores (RFS) have a range from 12 to 686 and were subdivided into four groups: low (15%: 12–69), medium (30%: 70–184), high (30%: 185–396), and very high (25%: 400–686), each with its own color coding and suggested actions, as shown in Table 6 and Table 7.
Finally, with this numerical score, the classification and creation of the “failure risk” map of the water distribution network pipes can be applied.

3. Case Study

The developed model was applied to the water supply system (WSS) of the Aerospace Science and Technology Department (DCTA), located in São José dos Campos, São Paulo, Brazil.
In this water supply system (Figure 1), raw water is collected from underground sources (three tubular wells) to the disinfection unit of the water treatment station. Additionally, a surface source (Vidoca Stream) offers raw water conducted through supply lines to the water treatment station (WTS), which is a conventional station that operates by gravity and includes coagulation, flocculation, sedimentation, rapid filtration, and chlorination processes. The potable water storage capacity at the WTS is 2500 m3. Then, treated water is supplied to the consumption points through the distribution network, which covers a total area of 7.2 km2. The network is composed of pipelines of various diameters (from 25 mm to 300 mm) and materials presented in Table 4 (G.I, PVC, MPVC, CIP, and HDPE). The WTS produces an average of 3028 m3/day of potable water and serves approximately 20,000 people, 5000 of which are permanent and 15,000 are transient. It is important to highlight that a global improvement in the water quality index after some intervention actions carried out from 2016 to 2018 in this water supply system (WSS) motivated this study.
Currently, the operating distribution network totals 38,677 m and has seventeen reservoirs. Ten reservoirs are located in the low zone (altitude < 610 m): R1 to R10, while four are located in the high zone (altitude > 610 m): R11 to R14. In the high zone, there is also a peak-demand reservoir, R15, responsible for maintaining supply during peak hours. One reservoir (R16) is responsible for supplying the high zone reserve subsystem. Finally, the reservoir located at the water treatment station, R17, supply all of the reserve subsystems.

4. Results

It is important to note that the values depended, respectively, on the applied WQI and the feasible costs of the region (country, state, and city). Therefore, the numerical parameters of these tables (2, 3, and 5) should not be treated as absolute values for application in another water distribution system. Finally, the individual representation of each of the criteria (hydraulic, mechanical, qualitative, and financial) was presented in the GIS to support managers to decide what preventive (reduce the probability of the occurrence of an event) and/or protective (mitigate the consequences) actions should be prioritized.

4.1. Phase 1—Probability of Failure

The points of failure probability scores (FPSi) of the hydraulic and mechanical parameters were calculated using Table 2 and the results of the hydraulic simulation in the GIS with the QGISRed plugin, which integrated the hydraulic model produced in the Epanet. These results were used to create maps of the “risk level” related to hydraulic and mechanical failures in pipes, as shown in Figure 2 and Figure 3.
For the design of the water distribution network, the minimum dynamic pressure (Pmin) limits and maximum static pressure (Pmax) limits are established. The Pmin limit aims to ensure adequate service at the points of consumption, while the Pmax limit is related to the resistance of the pipelines and physical losses. According to [57], Pmin must be 10 m H2O and Pmax must be 50 m H2O. For Pmin (Figure 2a), the “very high risk” sections (in the beginning and end of network) are below the recommended limits, while the remaining pipe segments meet the required standards, with risk levels between “high” and “very low”. Analyzing the results of Figure 2b, it can be stated that there is only a network stretch related to Pmax (Figure 2b), with most risk levels between “low” and negligible risk.
The minimum velocity limit (Vmin) is recommended to ensure a permanent water flow in the distribution network so as not to affect the quality of the water supplied to the consumer [64]. Low velocities (above the minimum limit) in the distribution network favor durability, in terms of pipe abrasion, while higher velocities reduce the diameters and thus the cost of purchasing and installing the pipes. Moreover, velocities above the maximum limit may cause noise in the pipes and favor wear and tear due to abrasion and cavitation, increasing maintenance costs [65]. NBR 12218/2017 establishes that the maximum velocities (Vmax) must be limited to a head loss of 10 m/km and that velocities lower than 0.40 m/s should be avoided [57]. Thus, it can be stated that low velocities might be affecting the quality of water in the system, especially in end-of-network pipes with a “very high” risk (Figure 2c), while values above the recommended standards were not observed for Vmax (Figure 2d).
The maximum flow rate limit (FRmax) is related to Vmax and the roughness of the pipe, and it must meet the maximum daily demands of the water distribution network’s consumption points [58]. The analysis of the FRmax result (Figure 2e) shows that the operating distribution network is oversized for the current consumption standard, with a risk level ranging from “medium” to “very low”.
The structural deterioration of the pipe, associated with failure, was evaluated through two factors: diameter and length. The first is considered vital for failures in the distribution network and is reported in millimeters (mm), and the risk is inversely proportional to the diameter, as it is expected that the pipe with a larger diameter has a thicker wall compared to another pipe with a smaller diameter [14,66]. The second has been considered as one of the basic static parameters for structural integrity and is measured in meters (m), that is, the risk is directly proportional to the length, as it is expected that longer pipe segments are more susceptible to ruptures or leaks caused by external events (e.g., soil, loading, urbanization, etc.) [33,67]. Thus, it can be stated from the analysis of Figure 3 that there are many more pipelines susceptible to mechanical failure derived from the diameter (Figure 3b) than from the length (Figure 3a) due to a high and very high-risk classifications. However, the impacts of a failure due to the length are more damaging, as the pipelines with high risk are the main water distribution system feeders.

4.2. Phase 2—Assessment of the Degree of Impact

The qualitative and financial scores of the degree of impact of the individual criteria (IS) described in item 2.2 are presented in the following subitems. Table 3 and Table 5 were used in conjunction with geoprocessing and spatial analysis tools to determine the impact scores. These resources were employed in the calculation of the quality of potable water (ISWQI) and the estimated repair cost (ISCOST), and results were obtained for each pipe in the water distribution network.

4.2.1. Potable Water Quality

The spatial representation using the inverse distance weighting (IDW) of the results of the water quality index modified from the Council of Canadian Ministries of the Environment (CCMEWQIMod) along with the use of geospatial tools, detailed in File S2, made it possible to obtain the water quality in each distribution network pipe, and thus determine the ISWQI individually, as illustrated in Figure 4.
Analyzing the spatial distribution of the CCMEWQIMod, it can be seen that the worst index values are concentrated in the locations served by metal pipes (CIP and G.I), with an increase in the high zone (altitude > 610 m) and at the end of the network; therefore, the impact degree of these pipes presents a higher risk. In general, the impact degree due to variations in water quality in the system ranged from “very low” to “relatively high”.

4.2.2. Pipe Replacement Cost

A simple field calculation was implemented to calculate the estimated repair cost of each pipe in the distribution system. This involved multiplying the linear meter price (Table 4) of each pipe segment by its total length. Once the value in the pipe was determined, it received an impact score (ISCOST) by applying its index value in Table 5 for the risk classification, as illustrated in Figure 5. The analysis of these results allowed to identify the distribution network pipes with the highest financial impact associated with their replacement. In general, the highest scores are concentrated in the main pipes that supply the low and high zones, followed by large diameters and/or length pipes, with a consequence of failure between “very high to relatively high”. The remaining pipes, the more representative part of the network, had a consequence of failure between “medium and very low”.
Although the methodology provided an estimate of the financial costs associated with the replacement of each pipe in the water distribution network, it is essential that decisions regarding the necessary materials and services be defined through more detailed engineering work, taking into account undesirable design parameters presented by GIS and other factors, such as demand growth, environment, and modern construction techniques that may impact the total cost of the project. The choice of actions to be taken must be based on the specific needs of the water supply system and the best engineering practices available to ensure the efficiency and safety of the network, considering technical, economic, and environmental factors.

4.3. Phase 3—Risk of Failure

The final stage in the application of the model involved calculating the probability of failure score of the design parameters “PDPs” and total impact “ISTOTAL” for each pipe segment, and then using Table 6 and Table 7 to determine the risk of failure score (RFS). A simple field calculation was performed in QGIS to automatically insert the RFS (Equation (4)) values into the attribute table of the distribution network for each pipe.
The final result is an attribute column dedicated exclusively to the RFS value for each pipe segment in the water distribution system. The RFS values of all 1217 individual pipe segments in the network were then categorized and represented in the GIS to visually illustrate the priority and risk level of each pipe, as shown in Figure 6.
It is important to note that due to the lack of some operational data, micro-metering readings, and the monitoring of the level of reservoirs in the low zone, the hydraulic modeling of this distribution system was simplified, as detailed in File S1. Therefore, some secondary network pipelines were represented in the RFS map as “unclassified” (black color). For the new distribution networks installed and those that were replaced between 2019 and 2021, the RFS classification of the pipes was manually altered to “new pipes” (dashed green color) to avoid prioritizing unnecessary improvement actions regarding the rehabilitation of the distribution network pipes.
In this water distribution network, no pipes were identified with RFS values equal to or greater than 313 (orange color), that is, a “very high” failure risk.
The pipes with the highest risk of failure in this system have RFS values between 162 and 312 (yellow color), that is, a “high” failure risk; therefore, they are a priority for evaluation and renewal in the next 2 years. In this range, there are 11 network segments, 10 cast iron pipes (CIP) that total 3690 m in length and with diameters of 85, 100, and 300 mm, and only one modified polyvinyl chloride pipe (MPVC) with 210 m in length and 200 mm in diameter. The total estimated cost for replacing these networks was BRL 3,227,479.70.
The remaining pipes had RFS values between 70 and 161 (blue color) or scores equal to or less than 69 (green color). These pipes were considered with the lowest chance of failure compared to all other segments of the hydraulic network.

5. Discussion

The results classified 77% of the total length of the distribution system (≈30 km) to be considered for model validation, highlighting 11 pipes with a high risk of failure (≈3.7 km) and an estimated replacement value of BRL 3.2 million. Although 23% of the total network length was not classified by the RFS index due to the simplification of the hydraulic model that limited the obtaining of necessary hydraulic parameters, these pipes represent a lower risk to the system, since they are secondary networks of reduced length. In addition, partial results obtained regarding mechanical, qualitative, and financial parameters can be considered individually or collectively to prioritize interventions in these pipes, adapting the risk matrix to available results. For example, when evaluating the impact on potable water quality individually, the worst results (higher risk) were observed in locations served by metal pipes (CIP and G.I) aggravated in the high zone and in end-of-network sections; therefore, priority for replacement or rehabilitation of these secondary pipes should be prioritized.
The availability of data necessary for obtaining the project parameters and water quality in each pipe is a critical factor for this model. However, this information can be obtained at any time, unlike models that require historical records of infrastructure and/or operational failures in the network, which if not identified or are inaccurate, can make their application unfeasible or result in inefficient planning [1,34,35,37]. Additionally, the cost of pipe replacement should be improved by incorporating other costs associated with the performance of the services to avoid any distortions in the results.
It is recommended that this risk assessment model be applied to different water distribution systems for comparison with other renewal methods and for improvement. Although the results obtained in a real case study have presented the potential of the model to assist the planning of improvement actions in a system, the solutions may be different if applied in other locations. Additionally, it is essential to regularly update the design parameters and water quality using field data and financial values for tube replacement to prioritize renewal activities in future years based on the updated RFS index.
Finally, to turn the current model into a predictive model instead of its current casual structure for prioritization, it is advisable to incorporate systematic data recording (hydraulic, mechanical, qualitative, and financial) using, for example, the supervisory control and data acquisition (SCADA) system integrating macro-measurements into micro-measurements. The proposed method is also flexible to include other contributing factors and consequences, as well as incorporate priorities defined by the involved water concessionaires.

6. Conclusions

The proposed model was able to provide accurate information about the pipes (material and diameter for primary and secondary tubes), visually identifying the most vulnerable, sensitive, and high-risk parts within the system. This model was flexible in dealing with missing data and the spatial representation of the water quality index (WQI) was an important tool for monitoring and controlling the potable water distributed to the population, preventing health risks.
For large water distribution systems, it is recommended to include other relevant criteria (contributing factors and consequences) and systematically record the required data to improve the accuracy of the results. In this way, a more complete and accurate analysis of the network situation and the necessary actions to ensure the quality of the distributed water may be obtained.
Moreover, for small- and medium-sized water distribution systems with technical and financial limitations, this risk assessment model can be highly advantageous as it uses freely accessible computer tools and a simple methodology, without the need for complex statistical models, mathematical estimates, advanced regressions, or intensive computational resources. Additionally, it provides the essential results for the development of maintenance and rehabilitation schedules for the network.

Supplementary Materials

The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/w15081509/s1, File S1: Hydraulic Modeling [55,56,68,69,70,71,72]; File S2: Potable Water Quality [59,73,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,91].

Author Contributions

Conceptualization, R.N. and M.P.; methodology, R.N.; validation, R.N.; formal analysis, M.P.; investigation, R.N.; resources, M.P.; data curation, R.N. and E.A.; writing—original draft preparation, R.N.; writing—review and editing, M.P.; visualization, R.N. and E.A.; supervision, M.P. All authors have read and agreed to the published version of the manuscript.

Funding

The authors are grateful for the financial support received by Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) and Simão & Simão-Construtora e Incorporadora.

Data Availability Statement

The datasets used and/or analyzed during the current study are available from the corresponding author upon reasonable request.

Acknowledgments

To the Aerospace Science and Technology Department (DCTA) and the São Paulo State Basic Sanitation Company (SABESP) for their valuable support in the availability of the technical and operational data of the water distribution system and the Engineering Works and Services Price Bank, respectively. Their support was essential for the completion of this research.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Kabir, G.; Tesfamariam, S.; Francisque, A.; Sadiq, R. Evaluating Risk of Water Mains Failure Using a Bayesian Belief Network Model. Eur. J. Oper. Res. 2015, 240, 220–234. [Google Scholar] [CrossRef]
  2. Gilbert, T.; James, P.; Smith, L.; Barr, S.; Morley, J. Topological Integration of BIM and Geospatial Water Utility Networks across the Building Envelope. Comput. Environ. Urban Syst. 2021, 86, 101570. [Google Scholar] [CrossRef]
  3. Minaei, A.; Haghighi, A.; Ghafouri, H.R. Computer-Aided Decision-Making Model for Multiphase Upgrading of Aged Water Distribution Mains. J. Water Resour. Plan. Manag. 2019, 145, 04019008. [Google Scholar] [CrossRef]
  4. Li, Z.; Liu, H.; Zhang, C.; Fu, G. Generative Adversarial Networks for Detecting Contamination Events in Water Distribution Systems Using Multi-Parameter, Multi-Site Water Quality Monitoring. Environ. Sci. Ecotechnol. 2023, 14, 100231. [Google Scholar] [CrossRef] [PubMed]
  5. Bakhtiari, P.H.; Nikoo, M.R.; Gandomi, A.H. Chapter 4—Evolutionary Computation Techniques for Optimal Response Actions against Water Distribution Networks Contamination. In Comprehensive Metaheuristics; Mirjalili, S., Gandomi, A.H., Eds.; Academic Press: Cambridge, MA, USA, 2023; pp. 65–84. ISBN 978-0-323-91781-0. [Google Scholar]
  6. Vishwakarma, A.; Sinha, S.K. Sinha Development of a Risk Modeling Framework for Water Pipeline Renewal Prioritization. Pipelines 2022, 2022, 61–69. [Google Scholar]
  7. Abd Rahman, N.; Muhammad, N.S.; Wan Mohtar, W.H.M. Evolution of Research on Water Leakage Control Strategies: Where Are We Now? Urban Water J. 2018, 15, 812–826. [Google Scholar] [CrossRef]
  8. Salehi, S.; Jalili Ghazizadeh, M.; Tabesh, M.; Valadi, S.; Salamati Nia, S.P. A Risk Component-Based Model to Determine Pipes Renewal Strategies in Water Distribution Networks. Struct. Infrastruct. Eng. 2021, 17, 1338–1359. [Google Scholar] [CrossRef]
  9. Wilson, D.; Filion, Y.; Moore, I. State-of-the-Art Review of Water Pipe Failure Prediction Models and Applicability to Large-Diameter Mains. Urban Water J. 2017, 14, 173–184. [Google Scholar] [CrossRef]
  10. Scheidegger, A.; Leitao, J.P.; Scholten, L. Statistical Failure Models for Water Distribution Pipes–A Review from a Unified Perspective. Water Res. 2015, 83, 237–247. [Google Scholar] [CrossRef] [PubMed]
  11. Robles-Velasco, A.; Cortés, P.; Muñuzuri, J.; Onieva, L. Prediction of Pipe Failures in Water Supply Networks Using Logistic Regression and Support Vector Classification. Reliab. Eng. Syst. Saf. 2020, 196, 106754. [Google Scholar] [CrossRef]
  12. Rifaai, T.M.; Abokifa, A.A.; Sela, L. Integrated Approach for Pipe Failure Prediction and Condition Scoring in Water Infrastructure Systems. Reliab. Eng. Syst. Saf. 2022, 220, 108271. [Google Scholar] [CrossRef]
  13. Jyrkama, M.I.; Pandey, M.D.; Li, M. Estimating Degradation Growth Rate and Time of Component Replacement from Limited Inspection Data Using Mixed-Effects Modelling. Nucl. Eng. Des. 2022, 388, 111618. [Google Scholar] [CrossRef]
  14. Kettler, A.J.; Goulter, I.C. An Analysis of Pipe Breakage in Urban Water Distribution Networks. Can. J. Civ. Eng. 1985, 12, 286–293. [Google Scholar] [CrossRef]
  15. Noori, A.; Bonakdari, H.; Hassaninia, M.; Morovati, K.; Khorshidi, I.; Noori, A.; Gharabaghi, B. A Reliable GIS-Based FAHP-FTOPSIS Model to Prioritize Urban Water Supply Management Scenarios: A Case Study in Semi-Arid Climate. Sustain. Cities Soc. 2022, 81, 103846. [Google Scholar] [CrossRef]
  16. Dawood, T.; Elwakil, E.; Novoa, H.M.; Delgado, J.F.G. Ensemble Intelligent Systems for Predicting Water Network Condition Index. Sustain. Cities Soc. 2021, 73, 103104. [Google Scholar] [CrossRef]
  17. Ostfeld, A. Water Distribution Networks. Intelligent Monitoring, Control, and Security of Critical Infrastructure Systems; Kyriakides, E., Polycarpou, M., Eds.; Studies in Computational Intelligence; Springer: Berlin/Heidelberg, Germany, 2015; Volume 565, ISBN 978-3-662-44159-6. [Google Scholar]
  18. Alves, D.; Blesa, J.; Duviella, E.; Rajaoarisoa, L. Leak Detection in Water Distribution Networks Based on Water Demand Analysis. IFAC-Pap. 2022, 55, 679–684. [Google Scholar] [CrossRef]
  19. Sitaropoulos, K.; Salamone, S.; Sela, L. Frequency-Based Leak Signature Investigation Using Acoustic Sensors in Urban Water Distribution Networks. Adv. Eng. Inform. 2023, 55, 101905. [Google Scholar] [CrossRef]
  20. Zhang, B.; Wan, W. A Transient-Features-Based Diagnostic Method of Multi Incipient Cracks in Pipeline Systems. Int. J. Press. Vessel. Pip. 2022, 199, 104701. [Google Scholar] [CrossRef]
  21. Xue, Y.; Yue, L.; Ding, R.; Zhu, S.; Liu, C.; Li, Y. Influencing Mechanisms of Gas Bubbles on Propagation Characteristics of Leakage Acoustic Waves in Gas-Liquid Two-Phase Flow. Ocean. Eng. 2023, 273, 114027. [Google Scholar] [CrossRef]
  22. Wan, W.; Chen, X.; Zhang, B.; Lian, J. Transient Simulation and Diagnosis of Partial Blockage in Long-Distance Water Supply Pipeline Systems. J. Pipeline Syst. Eng. Pract. 2021, 12, 04021016. Available online: https://ascelibrary.org/doi/10.1061/%28ASCE%29PS.1949-1204.0000562 (accessed on 19 March 2023). [CrossRef]
  23. Ana, E.V.; Bauwens, W. Modeling the Structural Deterioration of Urban Drainage Pipes: The State-of-the-Art in Statistical Methods. Urban Water J. 2010, 7, 47–59. [Google Scholar] [CrossRef]
  24. Shahata, K.; Zayed, T. Data Acquisition and Analysis for Water Main Rehabilitation Techniques. Struct. Infrastruct. Eng. 2012, 8, 1054–1066. [Google Scholar] [CrossRef]
  25. Martins, A.; Leitão, J.P.; Amado, C. Comparative Study of Three Stochastic Models for Prediction of Pipe Failures in Water Supply Systems. J. Infrastruct. Syst. 2013, 19, 442–450. [Google Scholar] [CrossRef]
  26. Osman, H.; Bainbridge, K. Comparison of Statistical Deterioration Models for Water Distribution Networks. J. Perform. Constr. Facil. 2011, 25, 259–266. [Google Scholar] [CrossRef]
  27. Tscheikner-Gratl, F.; Sitzenfrei, R.; Rauch, W.; Kleidorfer, M. Enhancement of Limited Water Supply Network Data for Deterioration Modelling and Determination of Rehabilitation Rate. Struct. Infrastruct. Eng. 2016, 12, 366–380. [Google Scholar] [CrossRef]
  28. Kabir, G.; Sadiq, R.; Tesfamariam, S. A Review of Multi-Criteria Decision-Making Methods for Infrastructure Management. Struct. Infrastruct. Eng. 2014, 10, 1176–1210. [Google Scholar] [CrossRef]
  29. Marques, J.; Cunha, M. Upgrading Water Distribution Networks to Work under Uncertain Conditions. Water Supply 2020, 20, 878–888. [Google Scholar] [CrossRef] [Green Version]
  30. Salehi, S.; Jalili Ghazizadeh, M.; Tabesh, M. A Comprehensive Criteria-Based Multi-Attribute Decision-Making Model for Rehabilitation of Water Distribution Systems. Struct. Infrastruct. Eng. 2018, 14, 743–765. [Google Scholar] [CrossRef]
  31. Trojan, F.; Morais, D.C. Prioritising Alternatives for Maintenance of Water Distribution Networks: A Group Decision Approach. Water SA 2012, 38, 555–564. [Google Scholar] [CrossRef] [Green Version]
  32. Tscheikner-Gratl, F.; Egger, P.; Rauch, W.; Kleidorfer, M. Comparison of Multi-Criteria Decision Support Methods for Integrated Rehabilitation Prioritization. Water 2017, 9, 68. [Google Scholar] [CrossRef] [Green Version]
  33. Christodoulou, S.; Deligianni, A.; Aslani, P.; Agathokleous, A. Risk-Based Asset Management of Water Piping Networks Using Neurofuzzy Systems. Comput. Environ. Urban Syst. 2009, 33, 138–149. [Google Scholar] [CrossRef]
  34. Devera, J. Risk Assessment Model for Pipe Rehabilitation and Replacement in a Water Distribuition System. Master’s Theses, California Polytechnic State University, San Luis Obispo, CA, USA, 2013. [Google Scholar] [CrossRef] [Green Version]
  35. Cortez, H. A Risk Analysis Model for the Maintenance and Rehabilitation of Pipes in a Water Distribution System: A Statistical Approach. Master’s Thesis, California Polytechnic State University, San Luis Obispo, CA, USA, 2015. [Google Scholar] [CrossRef]
  36. D’Ercole, M.; Righetti, M.; Raspati, G.S.; Bertola, P.; Maria Ugarelli, R. Rehabilitation Planning of Water Distribution Network through a Reliability—Based Risk Assessment. Water 2018, 10, 277. [Google Scholar] [CrossRef] [Green Version]
  37. Salehi, S.; Tabesh, M.; Jalili Ghazizadeh, M. HRDM Method for Rehabilitation of Pipes in Water Distribution Networks with Inaccurate Operational-Failure Data. J. Water Resour. Plan. Manag. 2018, 144, 04018053. [Google Scholar] [CrossRef]
  38. Grigg, N.S.; Fontane, D.G.; Van Zyl, J. Water Distribution System Risk Tool for Investment Planning; Water Research Foundation: Denver, CO, USA, 2013. [Google Scholar]
  39. AWWA (American Water Works Association). Rehabilitation of Water Mains-M28; AWWA: Denver, CO, USA, 2014. [Google Scholar]
  40. Harvey, R.; McBean, E.A.; Gharabaghi, B. Predicting the Timing of Water Main Failure Using Artificial Neural Networks. J. Water Resour. Plan. Manag. 2014, 140, 425–434. Available online: https://ascelibrary.org/doi/10.1061/%28ASCE%29WR.1943-5452.0000354 (accessed on 22 November 2022). [CrossRef]
  41. St. Clair, A.M.; Sinha, S.K. Development of a Fuzzy Inference Performance Index for Ferrous Drinking Water Pipelines. J. Pipeline Syst. Eng. Pract. 2014, 5, 04014003. [Google Scholar] [CrossRef]
  42. Kutyłowska, M. Neural Network Approach for Failure Rate Prediction. Eng. Fail. Anal. 2015, 47, 41–48. [Google Scholar] [CrossRef]
  43. Marzouk, M.; Osama, A. Fuzzy-Based Methodology for Integrated Infrastructure Asset Management. Int. J. Comput. Intell. Syst. 2017, 10, 745–759. [Google Scholar] [CrossRef] [Green Version]
  44. Winkler, D.; Haltmeier, M.; Kleidorfer, M.; Rauch, W.; Tscheikner-Gratl, F. Pipe Failure Modelling for Water Distribution Networks Using Boosted Decision Trees. Struct. Infrastruct. Eng. 2018, 14, 1402–1411. [Google Scholar] [CrossRef] [Green Version]
  45. Phan, H.C.; Dhar, A.S.; Hu, G.; Sadiq, R. Managing Water Main Breaks in Distribution Networks––A Risk-Based Decision Making. Reliab. Eng. Syst. Saf. 2019, 191, 106581. [Google Scholar] [CrossRef]
  46. Boryczko, K.; Piegdoń, I.; Szpak, D.; Żywiec, J. Risk Assessment of Lack of Water Supply Using the Hydraulic Model of the Water Supply. Resources 2021, 10, 43. [Google Scholar] [CrossRef]
  47. Raspati, G.S.; Bruaset, S.; Bosco, C.; Mushom, L.; Johannessen, B.; Ugarelli, R. A Risk-Based Approach in Rehabilitation of Water Distribution Networks. Int. J. Environ. Res. Public Health 2022, 19, 1594. [Google Scholar] [CrossRef] [PubMed]
  48. Dandy, G.C.; Engelhardt, M.O. Multi-Objective Trade-Offs between Cost and Reliability in the Replacement of Water Mains. J. Water Resour. Plan. Manag. 2006, 132, 79–88. [Google Scholar] [CrossRef]
  49. Francisque, A.; Rodriguez, M.J.; Sadiq, R.; Miranda, L.F.; Proulx, F. Prioritizing Monitoring Locations in a Water Distribution Network: A Fuzzy Risk Approach. J. Water Supply Res. Technol.—AQUA 2009, 58, 488–509. [Google Scholar] [CrossRef]
  50. Rajani, B.; Kleiner, Y. Towards Pro-Active Rehabilitation Planning of Water Supply Systems. In Proceedings of the International Conference on Computer Rehabilitation of Water Networks-CARE-W, Dresden, Germany, 1 November 2002. [Google Scholar]
  51. Yamijala, S.; Guikema, S.D.; Brumbelow, K. Statistical Models for the Analysis of Water Distribution System Pipe Break Data. Reliab. Eng. Syst. Saf. 2009, 94, 282–293. [Google Scholar] [CrossRef]
  52. Sadiq, R.; Kleiner, Y.; Rajani, B. Water Quality Failures in Distribution Networks—Risk Analysis Using Fuzzy Logic and Evidential Reasoning. Risk Anal. Int. J. 2007, 27, 1381–1394. [Google Scholar] [CrossRef] [Green Version]
  53. Zhao, Z.; Wang, L.; Shi, W.; Li, C.; Wei, G. Motion Adsorption Characteristics of Particulate Matter in Water Supply Network. Water 2022, 14, 3550. [Google Scholar] [CrossRef]
  54. Desta, W.M.; Feyessa, F.F.; Debela, S.K. Modeling and Optimization of Pressure and Water Age for Evaluation of Urban Water Distribution Systems Performance. Heliyon 2022, 8, e11257. [Google Scholar] [CrossRef]
  55. Martínez, F.A.; Lerma, N.; Redhisp Group. “QGISRed v.0.15” QGIS Plugin. Institute of Water and Environmental Engineering Technical University of Valencia: València, Spain, March 2022. Available online: Https://Github.Com/Neslerel/QGISRed/Releases/Tag/v0.15 (accessed on 25 April 2022).
  56. Rossman, L.A. EPANET 2.0-Manual Do Usuário (Tradução e Adaptação); Tradução: Heber Pimentel GOMES e Moisés Menezes SALVINO; Laboratório de Eficiência Energética e Hidraúlica em Saneamento, Universidade Federal da Paraíba (UFPB); United States Environmental Protection Agency (EPA): Cincinati, OH, USA, 2009.
  57. NBR 12218; Projeto de Rede de Distribuição de Água Para Abastecimento Público—Procedimento. Associação Brasileira de Normas Técnicas (ABNT): Rio de Janeiro, Brazil, 2017.
  58. Netto, A.; Fernández, M.F. y Manual de Hidráulica; Editora Blucher: São Paulo, Brazil, 2018; ISBN 978-85-212-0889-1. [Google Scholar]
  59. Haider, H.; Alkhowaiter, M.H.; Shafiquzzaman, M.; AlSaleem, S.S.; Almoshaogeh, M.; Alharbi, F. Spatiotemporal Water Quality Variations in Smaller Water Supply Systems: Using Modified CCME WQI from Groundwater Source to Distribution Networks Spatiotemporal Water Quality Variations in Smaller Water Supply Systems: Using Modified CCME WQI from Groundwater Source to Distribution Networks. Water 2019, 11, 1884. [Google Scholar] [CrossRef] [Green Version]
  60. Giustolisi, O.; Laucelli, D.; Savic, D.A. Development of Rehabilitation Plans for Water Mains Replacement Considering Risk and Cost-Benefit Assessment. Civ. Eng. Environ. Syst. 2006, 23, 175–190. [Google Scholar] [CrossRef]
  61. Rogers, P.D.; Grigg, N.S. Failure Assessment Modeling to Prioritize Water Pipe Renewal: Two Case Studies. J. Infrastruct. Syst. 2009, 15, 162–171. [Google Scholar] [CrossRef]
  62. SABESP. Banco de Preços de Obras e Serviços de Engenharia; SABESP: São Paulo, Brazil, 2022. [Google Scholar]
  63. Okabe, M.; Ito, K. Color Universal Design (Cud)-How to Make Figures and Presentations That Are Friendly to Colorblind People. Retrieved April. 2008, 21, 2017. [Google Scholar]
  64. Gomes, H.P. Sistemas de Abastecimento de Água: Dimensionamento Econômico e Operação de Redes e Elevatórias, 3rd ed.; Editora Universitária-UFPB: João Pessoa, Brazil, 2009; ISBN 978-85-7745-349-8. [Google Scholar]
  65. Tsutiya, M.T. Abastecimento de Água, 3rd ed.; Departamento de Engenharia Hidráulica e Sanitária da Escola Politécnica da Universidade de São Paulo: São Paulo, Brazil, 2006; ISBN 85-900823-6-9. [Google Scholar]
  66. Tesfamariam, S.; Rajani, B.; Sadiq, R. Consideration of Uncertainties to Estimate Structural Capacity of Ageing Cast Iron Water Mains—A Possibilistic Approach. Can. J. Civ. Eng 2006, 33, 1050–1064. [Google Scholar] [CrossRef] [Green Version]
  67. Najafi, M.; Kulandaivel, G. Pipeline Condition Prediction Using Neural Network Models. In Pipelines 2005: Optimizing Pipeline Design, Operations, and Maintenance in Today’s Economy; ASCE: Reston, VA, USA, 2005; pp. 767–781. [Google Scholar]
  68. Loucks, D.P. Water Resource Systems Models: Their Role in Planning. J. Water Resour. Plan. Manag. 1992, 118, 214–223. [Google Scholar] [CrossRef]
  69. Boulos, P.F.; Jacobsen, L.B.; Heath, J.E.; Kamojjala, S.R.I. Real-time Modeling of Water Distribution Systems: A Case Study. Journal-American Water Works Assoc. 2014, 106, E391–E401. [Google Scholar] [CrossRef]
  70. Walski, T.M. Case Study: Pipe Network Model Calibration Issues. J. Water Resour. Plan. Manag. 1986, 112, 238–249. [Google Scholar] [CrossRef]
  71. Shamir, U.; Howard, C.D. Engineering Analysis of Water-Distribution Systems. J. Am. Water Works Assoc. 1977, 69, 510–514. [Google Scholar] [CrossRef]
  72. Lingireddy, S.; Ormsbee, L.E.; Wood, D.J. Calibration of Hydraulic Network Models. Water Encycl. 2005, 3, 313–320. [Google Scholar]
  73. Haider, H.; Sadiq, R.; Tesfamariam, S. Risk-Based Framework for Improving Customer Satisfaction through System Reliability in Small-Sized to Medium-Sized Water Utilities. J. Manag. Eng. 2016, 32, 04016008. [Google Scholar] [CrossRef]
  74. Haider, H.; Haydar, S.; Sajid, M.; Tesfamariam, S.; Sadiq, R. Framework for Optimizing Chlorine Dose in Small- to Medium-Sized Water Distribution Systems: A Case of a Residential Neighbourhood in Lahore, Pakistan. Water SA 2015, 41, 614–623. [Google Scholar] [CrossRef]
  75. Bi, S.; Wang, L.; Li, Y.; Zhang, Z.; Wang, Z.; Ding, X.; Zhou, J. A Comprehensive Method for Water Environment Assessment Considering Trends of Water Quality. Adv. Civ. Eng. 2021, 2021, 5548113. [Google Scholar] [CrossRef]
  76. Duan, W.; Maskey, S.; Chaffe, P.L.B.; Luo, P.; He, B.; Wu, Y.; Hou, J. Recent Advancement in Remote Sensing Technology for Hydrology Analysis and Water Resources Management. Remote Sens. 2021, 13, 1097. [Google Scholar] [CrossRef]
  77. Fatima, S.U.; Khan, M.A.; Alamgir, A.; Mahmood, N.; Sulman, N. Multivariate and Spatial Methods-Based Water Quality Assessment of Chu Tran Valley, Gilgit Baltistan. Appl. Water Sci. 2022, 12, 129. [Google Scholar] [CrossRef]
  78. Elumalai, V.; Brindha, K.; Sithole, B.; Lakshmanan, E. Spatial Interpolation Methods and Geostatistics for Mapping Groundwater Contamination in a Coastal Area. Environ. Sci. Pollut. Res. 2017, 24, 11601–11617. [Google Scholar] [CrossRef]
  79. Elubid, B.A.; Huang, T.; Ahmed, E.H.; Zhao, J.; Elhag, K.M.; Abbass, W.; Babiker, M.M. Geospatial Distributions of Groundwater Quality in Gedaref State Using Geographic Information System (GIS) and Drinking Water Quality Index (DWQI) Geospatial Distributions of Groundwater Quality in Gedaref State Using Geographic Information System (GIS) and Drinking Water Quality Index (DWQI). Int. J. Environ. Res. Public. Health 2019, 16, 731. [Google Scholar] [CrossRef] [Green Version]
  80. Haldar, K.; Kujawa-Roeleveld, K.; Dey, P.; Bosu, S.; Datta, D.K.; Rijnaarts, H.H.M. Spatio-Temporal Variations in Chemical-Physical Water Quality Parameters Influencing Water Reuse for Irrigated Agriculture in Tropical Urbanized Deltas. Sci. Total Environ. 2020, 708, 134559. [Google Scholar] [CrossRef]
  81. García-Ávila, F.; Zhindón-Arévalo, C.; Valdiviezo-Gonzales, L.; Cadme-Galabay, M.; Gutiérrez-Ortega, H.; del Pino, L.F. A Comparative Study of Water Quality Using Two Quality Indices and a Risk Index in a Drinking Water Distribution Network. Environ. Technol. Rev. 2022, 11, 49–61. [Google Scholar] [CrossRef]
  82. Uddin, M.G.; Nash, S.; Olbert, A.I. A Review of Water Quality Index Models and Their Use for Assessing Surface Water Quality. Ecol. Indic. 2021, 122, 107218. [Google Scholar] [CrossRef]
  83. Ministerio de La Protección Social y Ministerio de Ambiente, Vivienda y Desarrollo Territorial de Colombia. Resolución 2115 de 2007. Características, Instrumentos Básicos y Frecuencias Del Sistema de Control y Vigilancia Para La Calidad Del Agua Para Consumo Humano; MPS/MAVDT: Bogotá Colombia, 2007. [Google Scholar]
  84. García-Ubaque, C.A.; García-Ubaque, J.C.; Rodríguez-Miranda, J.P.; Pacheco-García, R.; García-Vaca, M.C. Limitations of the Water Quality Risk Index as an Estimator of Quality for Human Consumption. Rev. Salud Pública 2018, 20, 204–207. [Google Scholar] [CrossRef]
  85. Duarte-Jaramillo, L.; Mendoza-Atencio, M.A.; Jaramillo-Colorado, B.E.; González-Álvarez, Á. Water Quality in the Municipalities of Sincerín and Gambote, Bolívar, Colombia (2017–2018). Rev. Fac. Ing. Univ. Antioquia 2022, 103, 77–87. [Google Scholar] [CrossRef]
  86. Canadian Council of Ministers of the Environment (CCME). Canadian Water Quality Guidelines for the Protection of Aquatic Life: Quality Index, User’s Manual—2017 Update. In Canadian Environmental Quality Guidelines; CCME: Winnipeg, Canadian, 1999; Available online: https://ccme.ca/en/res/wqimanualen.pdf (accessed on 23 September 2022).
  87. WHO. Guidelines for Drinking-Water Quality, 4th ed.; Incorporating the 1st Addendum; Library Cataloguing-in-Publication Data; World Health Organization: Geneva, Switzerland, 2017; ISBN 978-92-4-154995-0.
  88. Brasil. Ministério da Saúde. Portaria GM/MS no 888, de 04 de maio de 2021. Altera o Anexo XX da Portaria de Consolidação GM/MS no 5, de 28 de Setembro de 2017, Para Dispor Sobre os Procedimentos de Controle e de Vigilância da Qualidade da água para Consumo Humano e seu Padrão de Potabilidade. Diário Oficial União. 2021; p. 127. Available online: https://www.in.gov.br/web/dou (accessed on 23 September 2022).
  89. Kilgour, B.W.; Francis, A.P.; Mercier, V. Reducing the Sensitivity of the Water Quality Index to Episodic Events. Water Qual. Res. J. Can. 2013, 48, 1–13. [Google Scholar] [CrossRef]
  90. Nistor, M.M.; Rahardjo, H.; Satyanaga, A.; Hao, K.Z.; Xiaosheng, Q.; Sham, A.W.L. Investigation of Groundwater Table Distribution Using Borehole Piezometer Data Interpolation: Case Study of Singapore. Eng. Geol. 2020, 271, 105590. [Google Scholar] [CrossRef]
  91. Gotway, C.A.; Ferguson, R.B.; Hergert, G.W.; Peterson, T.A. Comparison of Kriging and Inverse-Distance Methods for Mapping Soil Parameters. Soil Sci. Soc. Am. J. 1996, 60, 1237–1247. [Google Scholar] [CrossRef]
Figure 1. Location and characterization of the water distribution system.
Figure 1. Location and characterization of the water distribution system.
Water 15 01509 g001
Figure 2. Risk level associated with hydraulic failure in pipes: (a) minimum pressure; (b) maximum pressure; (c) minimum velocity; (d) maximum velocity; and (e) maximum flow.
Figure 2. Risk level associated with hydraulic failure in pipes: (a) minimum pressure; (b) maximum pressure; (c) minimum velocity; (d) maximum velocity; and (e) maximum flow.
Water 15 01509 g002
Figure 3. Risk level associated with mechanical failure in pipes: (a) length and (b) diameter.
Figure 3. Risk level associated with mechanical failure in pipes: (a) length and (b) diameter.
Water 15 01509 g003
Figure 4. Qualitative/social consequence: (a) IDW interpolation—water quality; (b) ISWQI impact degree.
Figure 4. Qualitative/social consequence: (a) IDW interpolation—water quality; (b) ISWQI impact degree.
Water 15 01509 g004
Figure 5. Financial consequence: pipe replacement cost.
Figure 5. Financial consequence: pipe replacement cost.
Water 15 01509 g005
Figure 6. Water distribution network failure risk map.
Figure 6. Water distribution network failure risk map.
Water 15 01509 g006
Table 1. Some recent studies (2013–2022), categorization (Cat.), and the number of criteria effective in pipe renewal planning.
Table 1. Some recent studies (2013–2022), categorization (Cat.), and the number of criteria effective in pipe renewal planning.
YearAuthorsRisk 1Pipes Renewal Planning 2
Cat.No. Criteria
2013Devera [34]PFCM, H, EC, O, E, S10
2014Harvey et al. [40]PFPM, O5
St. Clair and Sinha [41]PFCM, H, EC, O, QS14
2015Kutyłowska [42]PFPM4
2017Marzouk and Osama [43]PFCM, H, EC, O, P11
2018Winkler et al. [44]PFPM, H, O, SL10
D’Ercole et al. [36]PFCH, O3
Salehi et al. [37]PFPM, H6
2019Phan et al. [45]PFCM, EC, O, E6
2021Salehi et al. [8] 3PFCM, H, EC, P, S, QS19
Boryczko et al. [46]PFCO, S2
2022Raspati et al. [47]PFCM, H, EC, O8
Notes: 1—Risk: PFP = probability of failure pipe; PFC = probability and consequence of failure pipe. 2—Cat.(main criteria): M = mechanical (material, age, length, diameter); H = hydraulic (pressure, velocity, flow); O = operational (failure history, breakage, leakage); EC = environmental and climate (traffic load, land use, road type); E = economic (repair cost, social cost, lost water); P = physical (soil properties); S = social (customer classification, population without water); SL = spatial (number of valves on the pipe); and QS = qualitative and security (potential of hydraulic/biological threat in the pipe). 3—Only criteria applied in the case studies used for model validation (Anytown and Two-loop).
Table 2. Risk level and corresponding failure probability score.
Table 2. Risk level and corresponding failure probability score.
Pipe Design Parameters (PDPs)Risk Level and Corresponding Failure Probability Score (FPSi)
V. LowLowR. LowMediumR. HighHighV. High
1234567
Hydraulic 1Pmin (m.w.c) 22525–2222–1919–1616–1313–10<10
Pmax (m.w.c) 22525–3030–3535–4040–4545–50>50
Vmin (m/s) 31–0.90.9–0.80.8–0.70.7–0.60.6–0.50.5–0.4<0.4
Vmax (m/s) 30.9–11–1.11.1–1.21.2–1.31.3–1.41.4–1.5>1.5
Flow rate (L/s)<0.80.8–21.621.6–42.542.5–63.363.3–84.284.2–105>105
MechanicalLength (m)<1010–108108–206206–304304–402402–500>500
Stiffness Ø (mm)≥300300–250250–200200–150150–100100–50≤50
Notes: Source: adapted by the authors based on Salehi et al. [30,37]. 1—Values adjusted for the study area, according to normative limits [57], 50 mm ≤ nominal diameter (DN) ≤ 300 mm. 2—Pmin > 25 m H2O; Pmax < 25 m H2O, it is considered a negligible risk (NR), i.e., FPSPressure = 0. 3—Vmin > 1 m/s; Vmax < 0.9 m/s, it is considered FPSVelocity = 0.
Table 3. Risk level and corresponding impact score based on the water quality index.
Table 3. Risk level and corresponding impact score based on the water quality index.
Impact CriteriaRisk Level and Corresponding Impact Score (ISWQI)
V. LowLowR. LowMediumR. HighHighV. High
1234567
Water Quality Index
CCME WQIPipe [59]
100–9594–8988–8079–6564–4544–2524–0
Table 4. Estimated cost of the distribution network pipes.
Table 4. Estimated cost of the distribution network pipes.
Diameter (mm)Abbreviation 1Price Per Linear Meter 2 Pricing Source 3
MaterialLaborTotalMaterialLabor
50G.I BRL     97.53 BRL   24.18 BRL   121.71 HM01210 70,080,034
100 BRL   184.20 BRL   28.19 BRL   212.39 HM01213 70,080,035
100CIP BRL   342.25 BRL   28.19 BRL   370.44 HM04118 70,080,035
200 BRL   441.19 BRL   39.29 BRL   480.48 HM04105 70,080,035
300 BRL   656.56 BRL   52.80 BRL   709.36 HM04107 70,080,039
50 BRL     97.53 BRL   24.18 BRL   121.71 HM01210 70,080,034
60 BRL   150.09 BRL   24.18 BRL   174.27 HM01211 70,080,034
85 BRL   331.56 BRL   24.18 BRL   355.74 HM04129 70,080,034
125HDPE BRL     94.47 BRL   26.23 BRL   120.70 HM02085 70,140,034
90 BRL     64.19 BRL   26.23 BRL     90.42 HM02093 70,140,034
100MPVC BRL   103.41 BRL   18.62 BRL   122.03 HM01930 70,080,003
125 BRL   103.41 BRL   18.62 BRL   122.03 HM01930 70,080,003
150 BRL   182.55 BRL   21.63 BRL   204.18 HM01931 70,080,004
200 BRL   323.24 BRL   23.43 BRL   346.67 HM01932 70,080,005
100PVC BRL     90.32 BRL   18.62 BRL   108.94 HM01914 70,080,003
110 BRL     90.32 BRL   18.62 BRL   108.94 HM01914 70,080,003
160 BRL   130.20 BRL   21.63 BRL   151.83 HM07154 70,080,004
200 BRL   215.85 BRL   23.43 BRL   239.28 HM07155 70,080,005
25 BRL    4.76 BRL     2.41 BRL    7.17 HM01612 70,080,067
32 BRL    9.53 BRL     9.66 BRL     19.19 HM01613 70,080,023
40 BRL     16.55 BRL   13.72 BRL     30.27 HM01614 70,080,012
50 BRL     19.02 BRL   16.80 BRL     35.82 HM01615 70,080,001
60 BRL     25.84 BRL   16.80 BRL     42.64 HM01915 70,080,001
75 BRL     51.64 BRL   17.39 BRL     69.03 HM01617 70,080,002
85 BRL     55.30 BRL   17.39 BRL     72.69 HM01916 70,080,002
50PVC SSR BRL     25.84 BRL   16.80 BRL     42.64 HM01915 70,080,001
75 BRL     55.30 BRL   17.39 BRL     72.69 HM01916 70,080,002
Notes: 1 materials: galvanized iron pipe (G.I); cast iron pipe (CIP); high-density polyethylene (HDPE); modified polyvinyl chloride (MPVC); polyvinyl chloride (PVC); and polyvinyl chloride with spigot/socket/ring (PVC SSR). 2 1 USD = 54,060 BRL on 30 September 2022, according to the Brazilian Central Bank. 3 Basic Sanitation Company of the State of São Paulo (Sabesp) (September, 2022) [62].
Table 5. Scoring criteria for pipe repair (ISCOST).
Table 5. Scoring criteria for pipe repair (ISCOST).
Impact CriteriaRisk Level and Corresponding Impact Score (ISCOST)
V. LowLowR. LowMediumR. HighHighV. High
1234567
FinancialCost Range (1.000 × BRL)0–22–1919–3636–5353–7070–87>87
Table 6. Risk matrix—RFS values.
Table 6. Risk matrix—RFS values.
TFPSTotal Failure Probability Score
ISTotal 678910111213141516171819202122232425262728293031323334353637383940414243444546474849
Total Impact Score 21214161820222426283032343638404244464850525456586062646668707274767880828486889092949698
318212427303336394245485154576063666972757881848790939699102105108111114117120123126129132135138141144147
424283236404448525660646872768084889296100104108112116120124128132136140144148152156160164168172176180184188192196
53035404550556065707580859095100105110115120125130135140145150155160165170175180185190195200205210215220225230235240245
63642485460667278849096102108114120126132138144150156162168174180186192198204210216222228234240246252258264270276282288294
7424956637077849198105112119126133140147154161168175182189196203210217224231238245252259266273280287294301308315322329336343
848566472808896104112120128136144152160168176184192200208216224232240248256264272280288296304312320328336344352360368376384392
9546372819099108117126135144153162171180189198207216225234243252261270279288297306315324333342351360369378387396405414423432441
1060708090100110120130140150160170180190200210220230240250260270280290300310320330340350360370380390400410420430440450460470480490
1166778899110121132143154165176187198209220231242253264275286297308319330341352363374385396407418429440451462473484495506517528539
12728496108120132144156168180192204216228240252264276288300312324336348360372384396408420432444456468480492504516528540552564576588
137891104117130143156169182195208221234247260273286299312325338351364377390403416429442455468481494507520533546559572585598611624637
148498112126140154168182196210224238252266280294308322336350364378392406420434448462476490504518532546560574588602616630644658672686
Table 7. Legend of the failure risk scores and linguistic scale.
Table 7. Legend of the failure risk scores and linguistic scale.
RFS ValueColor 1Failure Risk LevelSuggested
Action 2
RGB Description
≤69(0, 158, 15)GreenLowA
70 to 184(86, 180, 233)BlueMediumB
185 to 396(240, 228, 66)YellowHighC
≥400(230, 159, 0)OrangeVery HighD
Notes: 1 the adaptation of the color palette was chosen to better identify it with the basic map colors and to avoid any misunderstandings in color identification by potential visually impaired users or those suffering from color blindness. [63]. 2 Action: A = routine inspection and condition assessment after 10 years; B = condition assessment/repair will be necessary in the next 10 years; C = condition assessment/rehabilitation will be necessary in the next 2 years; D = condition assessment/replacement may be necessary within 6 months.
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Nunes, R.; Arraut, E.; Pimentel, M. Risk Assessment Model for the Renewal of Water Distribution Networks: A Practical Approach. Water 2023, 15, 1509. https://doi.org/10.3390/w15081509

AMA Style

Nunes R, Arraut E, Pimentel M. Risk Assessment Model for the Renewal of Water Distribution Networks: A Practical Approach. Water. 2023; 15(8):1509. https://doi.org/10.3390/w15081509

Chicago/Turabian Style

Nunes, Rodrigo, Eduardo Arraut, and Marcio Pimentel. 2023. "Risk Assessment Model for the Renewal of Water Distribution Networks: A Practical Approach" Water 15, no. 8: 1509. https://doi.org/10.3390/w15081509

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop