View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

EPA/OAR RIN: 2060-AT89 Publication ID: Fall 2018 
Title: Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NSR): Project Emissions Accounting 
Abstract:

Under the New Source Review (NSR) pre-construction permitting program, sources undergoing modifications need to determine whether their modification is considered a major modification and thus subject to NSR pre-construction permitting. A source owner determines if its source is undergoing a major modification under NSR using a two-step applicability test. The first step is to determine if there is a "significant emission increase" of a regulated NSR pollutant from the proposed modification (Step 1) and the second step is to determine if there is a "significant net emission increase" of that pollutant (Step 2). In this action, we are proposing the consideration of emissions increases and decreases from a modification in Step 1 of the NSR major modification applicability test for all unit types (i.e., new, existing, and hybrid units).

 
Agency: Environmental Protection Agency(EPA)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: No  Unfunded Mandates: No 
EO 13771 Designation: Other 
CFR Citation: Undetermined     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: 42 U.S.C. 7401 et seq.   
Legal Deadline:  None

Statement of Need: In March 2018, the Agency issued an interpretative memorandum to clarify that we interpret our current NSR regulations to allow Project Emissions Accounting for hybrid units as well as for new and existing units. This regulation would further clarify the concept of Project Emissions Accounting for all types of emissions units.

Summary of the Legal Basis: 40 CFR 52.21

Alternatives: Alternatives will be analyzed as the proposal is developed.

Anticipated Costs and Benefits: Costs and benefits will be analyzed as the proposal is developed.

Risks: Risks will be analyzed as the proposal is developed.

Timetable:
Action Date FR Cite
NPRM  02/00/2019 
Additional Information: Docket # EPA-HQ-OAR-2018-0048
Regulatory Flexibility Analysis Required: No  Government Levels Affected: Federal, Local, State 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: Yes 
RIN Data Printed in the FR: No 
Agency Contact:
Jessica Montanez
Environmental Protection Agency
Office of Air and Radiation
C504-03,
Research Triangle Park, NC 27711
Phone:919 541-3407
Fax:919 541-5509
Email: montanez.jessica@epa.gov

Raj Rao
Environmental Protection Agency
Office of Air and Radiation
C504-03,
Research Triangle Park, NC 27711
Phone:919 541-5344
Fax:919 541-5509
Email: rao.raj@epa.gov